The Roberts Elementary School Gym & Classroom Addition, currently in progress for Jefferson School District #251, consists of an 11,500 SF expansion to the existing school. The project includes a new gymnasium, one classroom, and additional storage space. The building was constructed using CMU with a brick veneer exterior, supported by steel web trusses and topped with a membrane roof for durability and longevity. As part of the project, the old septic system was removed and replaced. This addition integrates with the existing school structure, providing upgraded spaces for physical education and classroom instruction.