About the Project
The Madison Middle School HVAC Renovation included a complete overhaul of the HVAC system for a 108,430 SF middle school. A new air handler unit was installed at the back of the building.
The Madison Middle School HVAC Renovation included a complete overhaul of the HVAC system for a 108,430 SF middle school. A new air handler unit was installed at the back of the building.